5.11 Final Results to be Submitted

5.11.1 The following final results should be submitted during the preliminary design:

1 Plans and sections of major crossing-over;

2 Plans of crowded areas;

3 Plans of incoming/outgoing lines of substations;

4 Survey results of hydrological sections;

5 Results of GPS field control and route annotation report;

6 Technical report of survey.